$3M

Project Start

November 2014

Project End

June 2016

Project Owner

City of Houston - PWE

Project Budget

$3M

Southeast Water Purification Plant

PMG was contracted to perform all Civil Construction, Structural Concrete, Cast-iron piping, pumps and valves installation, duct banks, and site drainage. Construction of new Thickened Sludge Pump Station (22’D x 30’W x 30’L) with 20” to 30” thick concrete walls, concrete  paving and building foundation, concrete repair in Flocculator Basins, site piping, detention pond and duct banks.  Installation of over 3500’ of Ductile Iron pipe of various sizes, installation of all mechanical pumps and valves, completion  of all site drainage, concrete pavement and sidewalks and site development.